Darien Storage – Phase 2 (Darien, CT)

Sustainable Building Systems (SBS) collaborated with TEC Engineering and Lavigna Associates to design and engineer a light gauge steel 3 story storage facility for the second phase of this project, with the Darien Office already completed.

 

Building type: 103,000 square foot, 3 story self storage.

The aim during collaboration was to construct a strong and durable structure, with long spans and large open areas, using only a small amount of structural steel.

Construction began in late January 2018 with the framing on the first floor taking a little over 2 weeks to complete.

The panelized walls arrived on site pre-assembled with the stacking order of all wall frames already in sequence of construction, significantly reducing the amount of handling and construction time on site.