Notice: is_comments_popup is deprecated since version 4.5.0 with no alternative available. in /var/www/sbsusa/src/wp-includes/functions.php on line 3899
 
 

Darien Office – Phase 1 (Darien, CT)

Sustainable Building Systems (SBS) panelized light gauge steel framing was used in the construction of a 3 story office building located in Darien, Connecticut.

 

Building type: 6,500 square foot, 3 story mixed use building.

The 6,500 square foot mixed use office building was the first phase of construction for this project. The 3 story office building was brought to weather tight in only 5 weeks allowing all remaining trades to complete the project in a short time period, in readiness for the projects’ second phase.

Other Images
Meta Info